so, I have a post-frame shed, 12x16. there are posts at 6' on the short sides and every 4' on the long side. posts are set ~18" below grade, on a 2" cap of cement over a few inches of well compacted gravel (holes were all about 27" or so, 2x6 girder runs level at the top (very level all the way around) around base,
ok, so, basically I have ~5.5" to grade from bottom of 2x6 girder to top of board, and the Ive got posts set in concrete, at 24" from the top of that board
19:14
0

so, I have a post-frame shed, 12x16. there are posts at 6' on the short sides and every 4' on the long side. posts are set ~18" below grade, on a 2" cap of cement over a few inches of well compacted gravel, holes were all about 27" or so, 2x6 girder runs level at the top (very level all the way a...