I was thinking of renting one of those electrical supply trucks you see at movie shoots and running 10000 v through it to vapourize it.
I've been up in the attic and shovelled all the loose fill away from my working area. but it's still a pain.
The main problem is I need to leave the wall up until the beam is installed.
So I can't go nuts on the studs and cut them away.