Walls primed, top cabinets have been attached the wall, working on my microwave now. Then I need to place the lower cabinets. I also fixed a bathroom sink (valve was sticky so I pulled the cartridge and lubed it). Looking forward to getting my lower cabinets placed.
I'm telling myself I should have appliances reinstalled by the end of the month with the possible exception of the fridge since it depends on the flooring (the fridge is the only thing I have plugged in over in the living room anyway).
My data center support work has finished, so I should have a bit more free time to tackle this. I really need to hurry up and get a sink back in my kitchen. That's the thing I miss the most.
I found out yesterday that my city has "First Step Meeting" for helping people can permits and such
I'm deciding whether or not I should get a permit for my shed. I found some loopholes that allow me to do it without permits and inspections but not sure which approach I should take