Major works are: remodeling the bathrooms, replacing the tiles and redoing the electrical installation.
 
9:50 PM
I hated that bathtub..
Lots of rubble..
At a certain point I decided that I couldn't handle the tough work of hammering out the underfloor, so I called a contractor, who sent me two rugged man and some of Hilti's finest.
The bathroom, now with the underfloor removed. My apologies for the low quality of the photos, but the wide angle is treacherous.
The heating pipes.
The tiles must go. Turns out that the creed holds better onto the tiles that on the concrete of the stairs. Major work incoming.
The plumbers work..
A new junction box
And now with conduits
Same in the bathroom
Lots of cement..
Finally the new underfloor
Adjusting the height of the stairs. The measurements were surprisingly laborious. Laying the screed quite easy. The secret is to make it as dry as possible. If it just as wet as the wet sand of a sandbox it won't make ripples on the surface when smoothing it.
Not perfect, but acceptable.
Prior the tiles were laid up to ca. 2 meters, now we are only going for 1.2meter. So we need new plaster
Away with the old one..
Setting the plaster rail
And the new base plaster
Laying some conduits. In the end I splattered the floor with 7 new conduits.
New finishing plaster
Here comes one of the emergency lights.
We place the washing machine and the drier in the basement. Therefor: new pipes and more rubble.
 
10:37 PM
@Martin - Wow, lots of work going on! Thanks for sharing :o)
 
The place for the new distribution box, in white we have something provisional, just to have some power while building.
The current "sketch" for the fuses. Prior I planned for single phase power, now we go triple phase. That means the house automation must go somewhere else
The base for the house automation. Lots is still missing.
Wago terminal clamps. Good stuff
The auxiliary underfloor heating.
Cables, cables and cables
The boombox
And the tool deposit
The 19"rack. My wife has still some reservations about it..
@Pᴀᴜʟsᴛᴇʀ2 You're welcome. It was an intense time. The kids are already complaining
@Pᴀᴜʟsᴛᴇʀ2 How is it going for you? Something new in life?
 