This project calls for toenailing the beams to the sills (see diagram). Would a screw work or is a nail better at these locations?
2x4's are about 1.5" x 3.5" in reality. How does this affect the integrity of a structure? Or do the engineers just do their math with 1.5" x 3.5"?