Q: Process scheduling accounting for multiple factors

cabralpintoI'm attempting to solve a problem that consists of scheduling two types (A and B) of processes to run. The system must be non-preemptive (once a process starts executing it must finish before another one takes its place). Both type A and type B have a desired instant to start executing (init), bu...

 
 
5 hours later…
10:23 PM
4
Q: How to devise an algorithm to generate a random but valid train track layout?

David JamesI am wondering if I have quantity C of curved tracks and quantity S of straight tracks, how I could devise a computer algorithm to design a "random" layout using all of those tracks, such that the following rules are satisfied: 1) The tracks, when all connected, form a closed (continuous) loop f...

 